The City of Bend offers five ADU plans that you can use for free. The City has already reviewed them for code compliance, so plan review for your project is limited mostly to site issues like setbacks and lot coverage. The plans only work inside Bend city limits, they have to be built exactly as shown, and they don’t cover your site plan, permit fees, system development charges, or the cost of building. Here’s how the program works, in plain terms.
Rules change, so confirm current details with the City of Bend before you apply.
What is Bend’s pre-approved ADU plan program?
It’s a City of Bend program that lets property owners reuse building plans the City has already reviewed and approved for compliance with the Oregon Residential Specialty Code. Because the structural review is already done, the City limits plan review on your permit to non-structural, site-related questions such as setbacks and lot coverage. The City says this shortens approval timelines and lowers permitting costs. It doesn’t publish a set number of days for pre-approved plans.
The program started with one plan as a pilot. On June 1, 2026, the City announced four more, for five in all. The City says it “has licensed the use of five pre-approved plans as part of a pilot program.”
Which plans are available?
As listed on the City’s program page:
| Plan | Size | Layout | Notes |
|---|---|---|---|
| Cascade Cottage | 779 sq ft | 1 bed, 1 bath, single level | Type A accessible; covered patio; mirrored version available |
| Modern Mill House | 500 sq ft | 1 bed, 1 bath, single level | Narrow footprint; qualifies as a 2nd ADU design; covered patio |
| Deschutes Bungalow | 799 sq ft | 2 bed, 1 bath, single level | Type A accessible; Craftsman bungalow look; covered patio |
| Mt Bachelor Pad | 799 sq ft | 2 bed, 1 bath, 2nd-story living | 2-car garage with mudroom; covered deck |
| The Joel | 576 sq ft | Studio, 1 bath, single level | Shared by the City of Eugene; vaulted ceiling; covered porch |
Most plans come with a small set of pre-approved options, such as a mirrored layout, a single or double vanity, or a patio extension. You pick those options on the submittal checklist before you apply.
Who can use the plans?
The plans are licensed for permitting use inside Bend city limits only, with the permit filed directly with the City of Bend. Outside City of Bend permitting, the City limits use of the four Sierra James plans to bids and cost estimates, and any other use needs the designer’s permission. So these plans don’t apply to a lot in Sisters, Redmond, Tumalo, or elsewhere in unincorporated Deschutes County.
Inside the city, the City’s pages don’t tie the plans to one builder. The program page says most owners work with “an architect, designer, or licensed general contractor” to fit the plan to their lot, and at minimum you need a site plan. The property owner signs the City’s End User Agreement, which goes in with the permit application.
The plans can be used on any residential lot in Bend city limits, or where the development code or a land use approval otherwise allows them. The usual ADU rules still apply. An ADU needs a lot with a single-unit home, townhome, or manufactured home. A lot created by a middle housing land division can’t have one. You can have up to two ADUs on a lot: the first up to 800 square feet and a second up to 500. The City also notes the plans can work for cottage clusters and detached duplexes, triplexes, and quadplexes.
What does “built exactly as shown” mean?
It means no design changes. The City’s policy says projects must be built “exactly” as shown on the approved plan set, only the pre-approved options are allowed, and revisions are prohibited unless the Building Official requires one for site conditions. If a revision is required, the applicant pays the design cost and fees.
There’s also a site limit. The City says the Master/Reissue path is limited to sites with no more than 2 feet of slope across the side at the footing, and to projects that don’t need changes to the design criteria or construction. A steep lot or a request like a bigger window or a different roofline takes you out of the program. At that point you need your own plans.
What does it save, and what doesn’t it?
What it saves:
- The plans themselves. There’s no charge to use them, which the City calls “significant savings in the typical up-front design cost.”
- Structural plan review. Review on your permit is limited to non-structural, site-related items.
What it doesn’t save:
- Permit and review fees. Building permit fees, site-specific plan review fees, and planning fees still apply.
- System development charges (SDCs). These still apply. The City provides permit fee and SDC estimates by email (building@bendoregon.gov), and it has an SDC deferral program and an SDC loan option you can ask about.
- The site plan and paperwork. The submittal checklist asks for a site plan, a residential water meter and supply sizing worksheet, a stormwater compliance statement, an erosion control template, and the residential wildfire hazard mitigation checklist. Depending on the site, it may also ask for a geotechnical report, a septic authorization form, or a drainage plan.
- Site work and utilities. Excavation, foundations, utility runs, driveways, and drainage depend on your lot, and the site plan has to show existing and proposed utilities. The City notes that a water service upgrade is usually not needed for an ADU, but a licensed plumber should check.
- Construction. Free plans don’t cover the cost of building the ADU.
- Wildfire building standards. Since May 15, 2026, new homes and new accessory structures in Bend must meet Section R327 of the Oregon Residential Specialty Code, and the pre-approved plan checklist includes the wildfire hazard mitigation checklist.
How do you apply?
The City’s steps, in short:
- Pick a plan and its options, and read the program policy. You can’t make changes to pre-approved plans.
- Prepare a site plan and the checklist items, and have the owner sign the End User Agreement.
- Apply in the City’s CityView portal under New Construction/Installation. In the description, say it’s a pre-approved plan and give the plan’s name.
- Upload the checklist, the agreement, and the other required documents. Don’t upload the plan set itself; City staff attach it from the master file based on the options you picked.
- Pay the minimum fees when you’re notified. Full review fees are due before the permit is issued.
For ADUs in general, the City estimates 4 to 8 weeks of processing, depending on how complete the application is and how fast you answer review comments.
How Sisters Custom Homes helps
We work in Bend, and we can build from the City of Bend’s free pre-approved ADU plans. We aren’t affiliated with the City or its program; we follow the same published rules as any applicant. Here’s where we fit in:
- Lot check first. We confirm the lot is inside city limits, eligible for an ADU, and flat enough for the program. We also check for NorthWest Crossing or historic-district rules and any CC&Rs. If a pre-approved plan won’t fit, we’ll say so early.
- Plan and options. We walk through the five plans with you and how each would sit on your lot.
- Site plan and application. We prepare the site plan and checklist items and help you through the CityView application. You sign the End User Agreement as the owner.
- Open-book budget. You see what the site work, utilities, fees, and construction cost before you commit.
- Construction. Cory manages the build, as he does on every project.
If the program doesn’t fit, we also build ADUs from custom plans. See our ADU page, our Bend page, and our side-by-side guide to ADU rules in Sisters vs. Bend.
FAQ
Are Bend’s pre-approved ADU plans really free?
Yes. The City of Bend doesn’t charge to use the plans. You still pay building permit and site-specific review fees, planning fees, and system development charges, and you still pay to build the ADU.
Can Sisters Custom Homes build a City of Bend pre-approved plan?
Yes. The City's program is open to Bend property owners, and the City notes that most owners work with an architect, designer, or licensed general contractor to fit the plan to their lot. We're a licensed general contractor (CCB #260626) and can handle the site plan, permit application, and construction. We aren't affiliated with the City's program.
Can I use Bend’s pre-approved plans outside Bend city limits?
No. The plans are licensed only for permitting with the City of Bend inside city limits. Outside that, the City limits use of the Sierra James plans to bids and cost estimates unless the designer gives permission.
Can I make changes to a pre-approved plan?
No. Only the pre-approved options listed for each plan are allowed, such as a mirrored layout. Other revisions are prohibited unless the Building Official requires one for site conditions, and then the applicant pays for the redesign and fees.
How many ADUs can I build on a Bend lot?
Up to two on an eligible lot. The first can be up to 800 square feet and a second up to 500 square feet. The Modern Mill House plan, at 500 square feet, qualifies as a second ADU.
Do wildfire building rules apply to a pre-approved ADU in Bend?
Yes. Since May 15, 2026, new homes and new accessory structures in Bend must meet Section R327 of the Oregon Residential Specialty Code, and the program’s submittal checklist includes the City’s wildfire hazard mitigation checklist.
Talk with us
Thinking about an ADU in Bend? Call 541-588-0162, email hello@sisterscustomhomes.com, or send us a note with the property’s general area and what you have in mind.